Jan De Nul has ordered a new 37,000-tonne rock installation vessel, George W. Goethals, to meet rising global demand for subsea cable protection, particularly in the North Sea and Southeast Asia. Designed in-house, the ultra-low emission vessel will feature advanced vertical and inclined fall pipe systems capable of installing large rocks at depths up to 400 meters, hybrid power and exhaust systems enabling operation on biofuel and green methanol, and electric excavators for efficient loading. Named after the engineer behind the Panama Canal, the vessel will strengthen Jan De Nul’s leadership in subsea rock installation and sustainable offshore construction.



