LNG Canada brings second train online, doubling export capacity

Chamber of Shipping > Blog > News > Local > LNG Canada brings second train online, doubling export capacity

LNG Canada has begun operations at its second liquefied natural gas (LNG) train in Kitimat, BC, marking full operational status for both processing units. With Trains 1 and 2 now producing LNG, the facility reaches its full 14 million tonnes per year capacity, positioning Canada as a growing player in global LNG exports. The project boasts a GHG intensity about 60% below the global average, reflecting its focus on lower-carbon production. The consortium thanked its workforce, contractors, and the Haisla Nation for their support and confirmed plans to continue advancing operations safely and responsibly. A Phase 2 expansion is under study, potentially adding two more trains. Engineering firms Fluor Corporation and JGC Holdings have been commissioned to update the front-end engineering and design (FEED) for the next phase.

Related Posts